Restroom Walls Removed at M-Town Studio
The lower portion of the walls had to be removed in the bathroom due to rotting and missing studs behind the sheetrock.
The lower portion of the walls had to be removed in the bathroom due to rotting and missing studs behind the sheetrock.
This is the studio control room before we were set to move in. read more
M-Town Studio control room finished with new sheetrock, paint and panels. read more
This is M-Town Studio after floor painting before we left for the day. When we had returned that night... read more
This is the view looking through the window of the live acoustics room into the studio control room after... read more
The restroom was atrocious before work had started. Cracks and holes going along side the wall where the toilet... read more
Picture of the studio control room which had only QuietBrace insulation fiberboard on the walls. read more
M-Town Studio restroom is complete with a fresh new vanity and sink, mirror, sheetrock, paint and flooring. Now you... read more
Compared to where we started, the control room has come a long way. At first it had nothing but... read more